Categories: Aviation

Pittsburgh Airport Eyes New $1.1 Billion Terminal

Pittsburgh International Airport will likely look much different in four years’ time.

The airport unveiled a conceptual design for a new $1.1 billion terminal this week that includes more natural light, concessions and an undulating roof to mimic the region’s rolling hills, according to the Pittsburgh Post-Gazette.

MORE Airlines & Airports

Better news for travelers passing through the Steel City, the new design should cut the time they spend from car to plane by half.

Scheduled to open in 2023, the new terminal would be developed inside of the C and D arms of the airport’s airside building and replace the existing landside building. It would allow for check-in, security and baggage claim as well as feature an expansive “meet-and-greet” area for visitors greeting arriving passengers.

The new terminal will include two levels. The top will be for departures and the bottom for arrivals with the ultimate goal being to “make the journey seamless,” according to project designer Luis Vidal, who also designed T2 at London’s Heathrow Airport.

“We want to build Pittsburgh’s airport. We’ve seen what a U.S. Airways’ airport looks like,” Allegheny County Airport Authority CEO Christina Cassotis told the Post-Gazette, referring to the airport’s development in the early 1990s as a major hub for U.S. Airways, which dropped Pittsburgh as a hub in 2004 and ceased operations in 2015 after merging with American Airlines.

“This is not just a project. This really is the last piece of the puzzle for Pittsburgh’s renaissance,” she added. In recent years, the airport has dramatically increased its number of destinations served from 37 to 67.

Airport Authority board members approved the new terminal’s conceptual design this week but officials believe the final cost of the new facility will likely increase “slightly.”

“We expect, as do the airlines, that there will be an increase in [cost],” added Cassotis.” But it will be what the airlines can bear.” The new terminal is expected to reduce annual operating and maintenance costs by $20 million.

According to the Post-Gazette, County Executive Rich Fitzgerald confirmed that no local taxpayer funds will be used to fund the new terminal. However, he did not rule out the possibility of state or federal support.

This post was published by our news partner: TravelPulse.com | Article Source |
TJS News

TravelPulse.com, part of the travAlliancemedia network of products, is the leading resource for the latest travel news, offers, and videos. Since 2002, TravelPulse.com has been delivering industry news, dynamic video content and important supplier and destination information that have allowed hundreds of thousands of travel agents to succeed. Now, with dedicated consumer content, TravelPulse is once again revolutionizing the way that travel content is consumed.

Recent Posts

Passenger Accused of Taking Someone Else’s First Class Seat on American Airlines Flight

A woman is accused of taking another passenger's first class seat on an American Airlines…

1 day ago

ICE Detains Southwest Airlines Flight Attendant; Friend Says He Has an Asylum Case

ICE detained a Southwest Airlines flight attendant at Nashville International Airport. An ICE spokesperson confirmed…

2 days ago

Delta Flight Diverts Over Suspected Lavatory Smoking, but Faulty Water Heater Found to Be the Cause

A Delta Air Lines flight from Seattle to Anchorage on July 11 diverted to Vancouver…

3 days ago

Sun Country Airlines Cuts Flights Amid Ongoing Pilot Crisis

Sun Country Airlines is feeling the effects of the pilot crisis, removing approximately 348 flights…

1 week ago

United Offers Free Flight Changes Amid Passenger Boycott of Trump Airport

United Airlines is preparing for a passenger boycott of President Donald J. Trump International Airport.…

1 week ago

July Fourth Gatherings With Celebrity Chef Jamie Gwen

With backyard entertaining, holiday festivities, and family gatherings in full swing.

2 weeks ago